Automatic Grade: | Automatic |
---|---|
Gluing Mode: | Piston / Plunger Pump |
Packaging Material: | LED Display |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Working area | 700mmx 700mm×100mm |
Output Speed | 0.5g/s -12g/s (per single pump)adjustable Example: 1:1 ratio max output 24g/s 10:1 ratio max output 13.4g/s |
processing craft | Dot ,line , arc , circle |
Speed | 0---250mm/s |
Movement accuracy | ≤±0.1mm |
Mixing ratio | 100:100 ---100:10 |
Gluing-out speed | 1g/s --12g/s per single pump (Max dispensing volume is base on two part Ratio) |
Repeated accuracy | ≤±2% |
Program memory | 999pcs |
Adhesive viscosity | 300cps~20000cps |
Operating mode | Manual /Automatic / third party signal |
Proportional control | PLC/ double cylinder plunger pump |
Flow control | Digital input |
Program | Teaching program |
Automatic controlling system | Touch screen / hand terminal |
Mixing way | Dynamic mixing |
Cleaning way | Self-cleaning |
Glue Tank | Stainless tank A (25L) B(25L) |
Vacuum defoamation(-0.1MPa),4L/s | |
Liquid level sensor and sound light alarm | |
Tank stirring | |
Power supply | 220V/50Hz/3500W |
Input air pressure | 0.4MPa-0.7MPa |
Dimension | |
Materials | Industrial aluminium+stainless material |
Drops always happened when valve closed . The reason may be low concentration of glue , big air-pressure or large diameter of needles.
Narrow needles will effect the flow of the liquid and cause back pressure . It will lead to dropping when the valve closed . Too narrow needles will effect the drainage of air when valve start to work, but it can be solved if change suitable needles .
Conical needles with less back pressure and liquid flow smoothly .
It is better to drainage of the air advance or use no-foam glue or deaeration to avoid the air cause dropping after valve closed .
The problem cause mainly because of the storage flow pressure tank or air pressure is not stable.
Inlet pressure regulating table should be set lower 10-15psi than factory minimum pressure . The pressure in pressure tank should be set upper than the middle pressure of regulating table . It should be avoided to use the pressure lower than the middle pressure of regulating table .
Control pressure of rubber valve at least higher than 60psi to assured glue evenly .
We should check the glue output speed at last . The glue is uneven if the time less than 15/1000s , the output speed more longer , the glue dispensing will be more stable .
It should be changed the pipe from 1/4 to 3/8 if the flow velocity too slowly .
The pipe is the shorter the better if no requirement .
Excessive fluid pressure and short valve opening time may lead to the air infiltration liquid . We can use the conical needles and reduce fluid pressure .
This problem is caused by heavy moisture and recycle instant glue . We should make sure to use new instant glue and wash the pipes with dry acetone . Make sure air dry and add filter between plant air pressure and valve .
Make sure to use black pipeline.
Don't add new UV glue to old UV glue in pressure tank , we should drain off the old UV glue before pouring new UV glue into pressure tank because the UV glue will produce bubble after a period of time and lead to glue dispensing unevenly .
Normally , it may cause air problem if the needle less than NO.20 . It is better to use large steel needles or conical needles to avoid to use winding needles
It is better to use storage pressure cylinder of methybenzene toluene to self-cleaning one time for each shift . The more frequently cleaning the better .
Suppliers with verified business licenses